WEINGART – LAKEWOOD YMCA

Lakewood, California

MHP provided the Structural Engineering for the major expansion and renovation of the Lakewood YMCA to better serve the local community. The project consists of a new two-story fitness center constructed with structural steel system, which supports exercise equipment and aerobic functions on the second floor above childcare and an administrative office on the first floor. A new two-story entry lobby provides natural lighting as well as creating connectivity between the community spaces. General renovation of the public and pool areas balances out the project.

SIZE:

20,000 Square Feet

Architect:

Studio One Eleven

Construction Cost:

$6M